How a control cycle decides

Each loop is sense → decide → execute → verify.

  1. Inputs — telemetry, forecast, grid stats (digest stored on the decision).
  2. Reserve — rules compute solar-bridge vs autonomy floor; MPC or an operator pin may replace the target (source: rules | mpc | operator), but an MPC pin cannot undercut the rules target. Risk uses the effective target. When adaptive load is on, both the autonomy floor and solar-bridge hour loads use a smoothed signal: max(30‑minute mean load_power, mean battery discharge), blended toward configured critical_load_w by priority order. Explanation fields include effective_critical_w, smoothed_load_w, smoothed_discharge_w, and adaptive_blend_a.
  3. Grid charge — reactive/ramp cap chain sets enable + amps; the binding factor is the lowest ceiling.
  4. Shedding — SOC/grid policy; restores only for entities with a shed snapshot.
  5. Execute — HA writes when not shadow and not write-paused (paused_grid_charge / paused_shedding). Planning still runs when optimization is “paused.”
  6. Verify — Overview shows intended vs applied for reserve and grid charge; join history by cycle_id.

If Overview disagrees with expected behavior, use Live forensics (admin) or MCP solar_explain_decision with the causality section — see mcp.md.